For outputs of 1000 to 8000 Kr/hr

Pyroās range of medium-sized gas-fired ovens are used if the mode of heating is preferred to electrical. Delivering the same superior productivity and performance, applicable for a wide array of applications with a compact footprint, these gas-fired ovens are high in efficiency and in yield.
Features & Specifications
Model | P-1611G | P-1615G | P-2015G | P-2415G | P-2420G |
---|---|---|---|---|---|
Chamber size (WxLxH) | 405 x 3355 x 150 | 405 x 4575 x 150 | 510 x 4575 x 200 | 610 x 4575 x 205 | 610 x 6100 x 205 |
Overall size (WxL) | 965 x 4520 | 965 x 5995 | 1070 x 5995 | 1680 x 5995 | 1680 x 7620 |
Capacity/hour | 310°C, 2000kg | 370°C, 1520kg | 420°C, 1225kg | 310°C, 3710kg | 370°C, 2925kg | 420°C, 2450kg | 310°C, 3565kg | 370°C, 2780kg | 420°C, 2305kg | 310°C, 7480kg | 370°C, 6000kg | 420°C, 5105kg | 310°C, 7410kg | 370°C, 5930kg | 420°C, 5035kg |
*Higher output available
Special Applications ā Tempering of Induction Hardened Parts, Tempering of Crankshafts
Applications
Stress Relieving
Pyroās reputation for valve spring expertise started with General Motors in 1997. GM purchased a Pyro electric oven, which allowed them to reduce cycle time from 35 to 9 minutes, from coiler to the end of conveyor. Moreover, with a much shorter preheat time of 10 minutes compared to the 45 minutes for a conventional oven, GM increased available production time by almost 4 weeks per year, and achieved considerable energy savings.
Tempering
Another Pyromaitre success story concerns tempering of hydro-formed torsion tubes. The conventional process was a 60-minute continuous batch process with an incredible 1056 parts per batch. The lean solution delivered on three different continents uses a 10-minute process with only 60 parts. This high-speed processing provides the opportunity for single-piece workflow thus eliminating part fixtures and external handling equipment. Additional benefits include a simplified and more robust robotics program and significantly reduced capital investment.
More about Medium Gas Fired Continuous Furnace
Ā» Springs
Ā» Suspension springs
Ā» Torsion springs
Ā» Wire forms
Ā» Valve springs
Ā» CV Joints
Ā» Leaf Springs
Ā» Shafts
Ā» Torsion tubes
Ā» Crankshafts
Ā» Induction hardened parts
- Industries Served
Ā» Springs
Ā» Suspension springs
Ā» Torsion springs
Ā» Wire forms
Ā» Valve springs
Ā» CV Joints
Ā» Leaf Springs
Ā» Shafts
Ā» Torsion tubes
Ā» Crankshafts
Ā» Induction hardened parts